Transport

Background Image

Transport

Divider Image
Our standard price offer includes transport of the elements from our factory to your building site.
Transport service is done from our long-therm partners. Usually, the wooden elements are loaded onto a closed semi-trailer (2.4x2.6x13.6m), with a total weight of up to 24 tons. For unloading packages, there should be a crane on site that is capable of unloading packages of at least 1.5-2 tons.

package plans

packing elements

truck-line

elements loading

Transport documents